Bathroom Waterproofing Treatment
Surface Prep & Priming: Clean and repair walls/floors, then apply a primer coat for good adhesion. Fiber Mesh Integration: Embed alkali-resistant fiber mesh (jhali) into the first waterproof coat, focusing on pipe areas and corners. Three-Coat Application: Apply second and third cementitious coats perpendicularly to each other for uniform thickness (1.5–2 mm per layer). Curing & Protection: Allow coatings to cure 3–5 days, protecting from water, dust, and foot traffic. Testing & Reinforcement: Conduct ponding test; reinforce around pipes and vulnerable junctions with extra mesh and flexible sealant.